Property Investment Consultants and Real Estate Specialists
EnglishHrvatskiRussianGerman formal - Sie

Property Quick Search


Advance Search

Weather in Croatia

Weather in Croatia

NEW BRIDGE ON CIOVO ISLAND PDF Print E-mail

Reduction of the heavy traffic during the season causing long traffic queues 

Description: 523 meter long movable bridge, 5,45 meters wide and 7 meters  above the sea level. The bridge will be built in the proximity of Trogir town.

Timeline: TBA

Significance:
- The new bridge will “overtake” some of the traffic on the old bridge that gets overcrowded easily and causes chaos during the period of high season.  
- Better connectivity with the Ciovo island